How to process the vendor quotes in PrW for subscription renewal
Learn how to efficiently process vendor quotes in PrW for subscription renewals to streamline your procurement process.
Introduction
Once subscription data has been validated and Pricing Requests have been shared with vendors, the next step in the renewal workflow is to receive the vendor quote and link it to the Subscription Renewal Project in PrW.
This ensures that customer-facing quotes are built with accurate vendor pricing, and the project moves smoothly toward completion and PO Assignment.
Previous Step: Preparing Subscription Data for Vendor Pricing
Prefer video? Watch the walkthrough here
See next: How to proceed with PO Assignment for approved renewal project quotes
Understanding Price Request Preparation in PrW
Before a Pricing Request can be raised, you must ensure that customer-validated subscription quantities, terms, and renewal dates are correctly captured in PrW.
You will use the Export for Pricing Request option in the Managed Subscription or Asset List console to generate a structured file that vendor teams can use to prepare renewal pricing.
This export includes product identifiers, usage terms, quantities, and any required metadata that vendors typically expect for processing a renewal quote.
Key Terms and Concepts
| Term | Definition |
|---|---|
| Renewals |
In the VAR ecosystem, Renewal refers to the process of extending, maintenance contract to continue service coverage for hardware or software. This typically involves reviewing expiring contracts, create asset lists for customers to approve, prepare list of assets/services to be priced, and initiate quoting process for services like: Cisco SmartNet maintenance contracts Managed service subscriptions etc
The renewal process ensures uninterrupted service, and allows for co-terming, identify potential product upgrades, or request for change in service levels |
| Renewal Engineer | Executes renewals by preparing asset lists, coordinating pricing, and generating quotes. |
| Managed Subscriptions | Internal representation of a vendor contract, used for managing customer-facing renewals. |
| Managed Subscription Console | The console where subscriptions are reviewed, updated and exported for validation and pricing |
| Renewal Project Console | A workspace grouping subscriptions based on customer , stages etc and processing the quotes for renewal project. |
| Price Request | Data shared with vendors to request updated buy-side subscription pricing. |
| Partner Quoting Workspace (PqW) | The quoting tool used to prepare customer-facing quotes using vendor pricing. |
Table of Contents
| No. | Topic | Detail | Timestamp |
| 1 | Introduction | Understanding MS console and process of customer validation | 00:00 |
| 2 | Key Terms and Concepts |
Defines key terms like Renewal Engineer, Managed Subscription etc | 00:20 |
| 3 | Table of Content | Provides a preview of the topics that will be covered in this video to help viewers understand the structure of the walkthrough. | 00:58 |
| 4 | Accessing Vendor Quote | Review how vendor quote are ingested and processed in PqW for customer quote generation | 01:10 |
| 5 | Renewal Project Console Overview | Renewal Project console layout- data, filters and actions | 02:00 |
| 6 | Linking Vendor Quotes to Renewal Projects | Adding new quote to project or removing existing quote | 03:00 |
| 7 | Reviewing Quote-Level Pricing & Customer Approval | Review of quotes by customer and how to proceed based on customer feedback, approval | 03:30 |
| 8 | Summary and what's next | Vendor PO assignment | 04:20 |
Watch the Video
1. Accessing Vendor Quote Data
After sharing the Pricing Request with the vendor, the vendor responds with a formal quote that includes pricing, terms, license quantities, and renewal period details.
You will use this vendor quote to create the customer-facing quote inside PqW.
Before linking the quote to the renewal project:
- Open PqW or any quoting tool that you use
- Create a new customer-facing quote using the vendor-provided pricing.
- Save the quote.
Only after the PqW Quote is created can it be linked to the Renewal Project inside PrW.
2. Overview of the Renewal Project Console (Layout Breakdown)
When you navigate to the Renewal Engineer > Subscription – Console, and select the Renewal Project tab, the layout contains:
A. Filters Section
You can filter using the filter bar on selected fields on top or on individual columns such as
- Assignee
- Project Stage
- Account
- Vendor
- Expiration Date
- Next TF Date
- Auto Renew
A Reset Filter button appears when filters are active that you can use to remove applied filters and go back to default view.
B. Grouping & Row Expansion
Projects are grouped by Project Stage and Renewal Project name.
Each group can be expanded/collapsed using the arrow icon.
Within each grouping, you can see:
- Stage (Overdue / In Progress / Assigned)
- Renewal Project Name
- Quote
- Vendor
- Subscription Reference ID
- Expiration Date
- Total List Price / Total Cost
C. Hyperlinks
These redirect you to detailed records:
| Field | Destination |
|---|---|
| Renewal Project | Opens the detailed Project record |
| Account Name | Opens Account |
| Vendor Name | Vendor page |
| Subscription Ref ID | Opens Managed Subscription Console filtered to that subscription |
| Quote ID | Opens customer-facing quote in PQW |
D. Actions Section (Top Right)
- Add Quote to Renewal Project
- Unassign Quote
- Refresh
3. Linking Vendor Quotes to Renewal Projects
Step 1: Select the Renewal Project Row
Tick the checkbox beside the relevant subscription renewal record.
Step 2: Click “Add Quote to Renewal Project”
A pop-up appears showing:
- Subscription details
- Current project details
- A dropdown to select the correct PqW Quote
Step 3: Choose the Appropriate Customer-Facing Quote
From the dropdown:
- Select the PQW quote created using vendor pricing
- Click Save
- The quote is now linked.
What happens next?
The Quote column updates with the linked quote ID.
The Renewal Engineer and Renewal Manager can now review aligned pricing.
4. Removing or Re-Linking Quotes (Unassign Quote)
If a quote is incorrect or mapped to the wrong project:
- Select the record.
- Click Unassign Quote.
- The quote link is removed.
You can now re-link the correct quote using Add Quote to Renewal Project.
This prevents wrong pricing or wrong customer associations.
5. Reviewing Quote-Level Pricing and Terms
Once the quote is linked:
- Customers review the quote externally (outside PrW).
- Renewal Engineer tracks approval.
After approval, manually update the PQW quote status to:
→ Quote Status = Won
Once the quote is marked as Won:
PrW automatically updates the Renewal Project Stage to Complete.
All linked subscriptions move to the final PO Assignment phase.
5. Summary and What’s Next
After the quote becomes Won:
Renewal Engineer performs Vendor PO Assignment.
This ensures:
- Each renewal item is mapped to the correct vendor
- Renewal cycle is aligned for the next subscription term
- Data is ready for procurement and backend processing
Related Tutorials
- How to Prepare and Share Subscription Data for Vendor Pricing
- How to assign Purchase Order to Approved Quote
In this article
- Introduction
- Understanding Price Request Preparation in PrW
- Key Terms and Concepts
- Table of Contents
- Watch the Video
- 1. Accessing Vendor Quote Data
- 2. Overview of the Renewal Project Console (Layout Breakdown)
- A. Filters Section
- B. Grouping & Row Expansion
- C. Hyperlinks
- D. Actions Section (Top Right)
- 3. Linking Vendor Quotes to Renewal Projects
- Step 3: Choose the Appropriate Customer-Facing Quote
- What happens next?
- 4. Removing or Re-Linking Quotes (Unassign Quote)
- 5. Reviewing Quote-Level Pricing and Terms
- → Quote Status = Won
- 5. Summary and What’s Next
- Related Tutorials
